ac 2948

$333.00

Form AC 2947. Instructions for completing this form are found in Exhibit 102-10C. The prime contractor must submit to the Engineer an original AC 2947. An original AC 2948 for each wage rate period during which work was performed by each subcontractor must also be provided. These forms must be submitted to the Engineer ac 8657

Quantity:
Add To Cart